Industry: civil infrastructure · Scope: earthworks, compaction, concrete transport and material haulage
Photo: earthworks and compaction on a construction site (group public material).
A civil contractor building a road corridor with bridge sections needed a full construction fleet rather than single machines. The work spans clearing and grubbing, embankment compaction, concrete supply for bridge structures, and daily haulage of aggregates. Sites like this run on tight schedules, so equipment commonality and parts availability directly affect progress.
The package covered four work fronts: Shantui bulldozers for clearing and shaping the embankment; Shantui road rollers for compaction; Sinotruk HOWO concrete mixers for bridge and pavement concrete delivery; and HOWO dump trucks for aggregate and earth haulage. Weichai engines, FAST transmissions and HanDe axles recur across the truck and machinery side of the package.
Machines were quoted as one fleet order with staged delivery matching the contractor's work phases. Export documentation, on-site commissioning, operator induction and a recommended wear-parts stock were included. Local service coverage in the project region was arranged through group partners so routine maintenance could be handled without shipping parts long distances.
The fleet moved through the clearing, earthworks and concreting phases of the corridor work. No project length, completion date or equipment counts are published by the contractor, so none are quoted here. Group-export references for infrastructure work in Belt-and-Road regions are documented in brand news material rather than tied to this specific corridor.
This case is a generalized summary based on publicly available group and brand material. No contractor name, project name or commercial figures are disclosed.
Tell us the work phases and volumes. We assemble the dozer, roller, mixer and truck package with delivery planning.